LAVIS NON STICKY NAIL EXTENSION POLY GEL 15
Couldn't load pickup availability
LAVIS Poly Extension Gel 15, a poly extension gel, a blend of powder and gel for long extensions, worked with slip solution.
What you get
- 1 x LAVIS Poly Extension Gel 15
Why techs stock it
- Powder and gel blend: the strength of powder with the control of gel.
- No monomer smell: cures under a UV or LED lamp.
- Up to 3 to 4 weeks: with proper prep and application.
- Works with dual forms: press and cure for fast, even extensions.
Specifications
| Brand | LAVIS |
|---|---|
| Line | Poly Extension Gel |
| Shade | 15 |
| Wear | Up to 3 to 4 weeks |
| Cure | UV or LED lamp |
| SKU | LAVISPG15 |
How to use it
- Prep: shape the free edge, buff off the shine and clean the cuticle line.
- Bond: apply LAVIS Protein Bond & Primer, then a thin base and cure.
- Load: put a small bead of gel on the nail or inside a dual form.
- Spread: with a brush wet with slip solution, push the gel into the shape you want.
- Set: cure fully, then shape the free edge with a file.
- Top: finish with LAVIS Diamond Top Coat and cure.
Who it suits
- Long extensions without monomer.
- Techs who work with dual forms.
- Clients who want length with a gel feel.
Which option to choose
Nearby shades in this line: 13, 14, 16. Choose poly gel for long extensions with forms; for natural-nail overlays, a builder gel in the bottle is quicker. All lines are on the LAVIS builder gel page.
Storing it
Close it tightly after each client and keep it away from the lamp and windows. Screen color can differ from the real product, so check a swatch when an exact match matters.
More to pair with it: LAVIS builder gels, LAVIS Protein Bond & Primer and LAVIS Gel Base.
Frequently Asked Questions
Do I need a lamp?+
Yes. It cures under a UV or LED lamp. LAVIS builder gels are made for a low heat spike, but cure in stages on thick layers.
Do I need slip solution?+
Yes. Dip the brush in slip solution to spread and shape the poly gel without it sticking to the brush.
How long does it last?+
Up to 3 to 4 weeks with proper prep, bonding and a sealed top coat.

